25 million for sustainable infrastructure
The municipality of Boden has been granted more than SEK 25 million for the project “Sustainable mobility and accessibility to the new industrial area of
The municipality of Boden has been granted more than SEK 25 million for the project “Sustainable mobility and accessibility to the new industrial area of
The railway line between Luleå and Boden needs to be expanded to a double track. This is according to Region Norrbotten, Luleå municipality, Boden municipality
Two cities with completely different abilities, but with a gigantic common challenge. Now Boden and Luleå will develop together with a common strategy. Boden and
Boden is facing a historic green social transformation where H2 Green Steel’s planned investment in green hydrogen-based steel production is an important accelerator. In just
Where should the road, railway, pedestrian and bicycle path to Boden Industrial Park and H2 Green Steel really be drawn? The physical planning unit at
Illustration of the infrastructure corridor from the air. The main purpose of the plan is to allow for a new infrastructure corridor from the South
Sweden’s Minister of Energy and Digitization Khashayar Farmanbar visited his hometown of Boden to meet Boden residents, H2 Green Steel, local energy companies and politicians.
Svenska kraftnät wants to invest SEK 8.4 billion in strengthening the power grid in the coastal areas of Norrbotten and Västerbotten, primarily in connection with
An important key player in the rapid climate change in the EU, Sweden and Boden is Boden’s Energy. Their capacity, willingness and quick response to
In October 2021, the municipality of Boden presented a proposal for a detailed plan for major establishments with industrial purposes at Boden Industrial Park. The
+46 921 620 00
bodenxt@boden.se
©BODENXT