The proposal: Here can the road to Boden Industrial Park go
Where should the road, railway, pedestrian and bicycle path to Boden Industrial Park and H2 Green Steel really be drawn? The physical planning unit at
Where should the road, railway, pedestrian and bicycle path to Boden Industrial Park and H2 Green Steel really be drawn? The physical planning unit at
Illustration of the infrastructure corridor from the air. The main purpose of the plan is to allow for a new infrastructure corridor from the South
The municipality of Boden is now presenting a proposal for a Conservation and Development Plan for the Gruvberget outdoor area. Association life and the general
+46 921 620 00
bodenxt@boden.se
©BODENXT