The proposal: Here can the road to Boden Industrial Park go Where should the road, railway, pedestrian and bicycle path to Boden Industrial Park and H2 Green Steel really be drawn? The physical planning unit at Read more » 28 February 2022
Detailed plan for the Svartbyn infrastructure area Illustration of the infrastructure corridor from the air. The main purpose of the plan is to allow for a new infrastructure corridor from the South Read more » 28 February 2022
This is how Gruvberget will be preserved and developed The municipality of Boden is now presenting a proposal for a Conservation and Development Plan for the Gruvberget outdoor area. Association life and the general Read more » 28 February 2022